On the Iowa

Part of On the record
Madison, WI

Iowa lead azide detonation in limbo; UW-Madison expert explains risks

·

Add On the record as a preferred source on Google
Iowa lead azide detonation in limbo; UW-Madison expert explains risks
Photo: By / KYOU-TV

Key facts

  • The Army’s plan to detonate nearly five tons of deteriorating explosives in Iowa remains in legal limbo.1
  • The Eighth Circuit Court of Appeals temporarily suspended an Environmental Protection Agency permit for the planned detonation of approximately 9,500.1
  • The EPA’s emergency permit included requirements for environmental sampling and monitoring before, during and after the detonation, along with cleanup and reporting requirements.1 Wisconsin has its own history of environmental contamination at the former Badger Army Ammunition Plant in Sauk County.1 The facility manufactured military propellants before production ended in 1975.1 Most of the facility’s buildings have since been demolished, and portions of the property have been repurposed.1

The Army’s plan to detonate nearly five tons of deteriorating explosives in Iowa remains in legal limbo, while a UW-Madison environmental health expert is raising concerns about what could be left behind after the explosion.1

The Eighth Circuit Court of Appeals temporarily suspended an Environmental Protection Agency permit for the planned detonation of approximately 9,500 pounds of lead azide at the Iowa Army Ammunition Plant in Middletown.1

The Army initially planned the operation for Friday, Nov. 20, before postponing it to Monday, Nov. 23..1 The Army, EPA and Department of Health and Human Services indicated in a joint statement Friday that they were continuing to work toward the operation.1

Court Order And Emergency Permit

Federal attorneys cited an emergency exception that could allow the Army to proceed without the suspended EPA permit..1 The court’s action followed an emergency motion filed by the Iowa Environmental Council and Sierra Club, represented by Earthjustice..1 The groups argue the EPA failed to adequately consider safer disposal alternatives and require sufficient environmental protections.1

The Army says it discovered the deteriorating lead azide in March and determined that controlled detonation was the lowest-risk disposal option..1 Officials warn that colder temperatures could further destabilize the explosives.1

UW-Madison Expert Weighs In

Dr. Henry Anderson is a UW-Madison adjunct professor of population health who spent four decades working in occupational and environmental health for the state..1 Anderson said disposing of the material presents a difficult dilemma.1

“So, people are kind of up in the air not knowing, isn’t there a better way? Shouldn’t they be burying it somewhere? Can’t they just leave it on site? But it’s gradually deteriorating,” Anderson said.

Anderson said one of his primary concerns is the potential spread of toxic lead dust..1

Anderson said, “And so, when I heard about this, the issue was you have dust generated from burning it or disposing of it, and then that gets up in the air. And then again, we think about, oh, it’s just an inhalational problem, but the dust settles.”

Anderson said dust could collect on leaves, soil and other outdoor surfaces, where children might come into contact with it..1 Anderson said grazing animals could also ingest contaminated soil, while runoff could potentially carry particles into waterways.1

Those are potential exposure pathways, not confirmed impacts of the planned detonation.1

Wisconsin’s Badger Plant History

The EPA’s emergency permit included requirements for environmental sampling and monitoring before, during and after the detonation, along with cleanup and reporting requirements..1 Wisconsin has its own history of environmental contamination at the former Badger Army Ammunition Plant in Sauk County..1 The facility manufactured military propellants before production ended in 1975..1 Most of the facility’s buildings have since been demolished, and portions of the property have been repurposed.1

The Wisconsin Department of Natural Resources told WMTV 15 News that approximately 50 environmental cases at the former plant have been closed, while about four remain open..1 The primary contaminants of concern at Badger include dinitrotoluenes, or DNTs, chemicals associated with explosives and propellant manufacturing.1

Anderson said Badger was a larger, different type of operation than the facility in Iowa..1 Anderson said its history does not mean the proposed Iowa detonation would result in similar contamination.1

Wisconsin Emergency Management says current federal modeling shows no identified impacts to the state from the planned Iowa detonation.1

Whether the detonation will take place Monday remains uncertain as the legal challenge continues.1

Report an error in this story

Sources

The numbers in the story point here. Each one links to the original article.

    See a sentence its source doesn’t back up?

    Tell us the source number and what’s wrong. We check every report. If we change the story, the fix goes on the corrections page with the old wording.